Why Veylon for Commercial
CAPEX or OPEX, your call
Own the system and capture full savings, or sign a zero-CAPEX PPA and pay only for generation. We model both transparently.
Systems designed for real buildings
Three-phase LT or HT, battery backup for critical loads, advanced monitoring dashboards. Not scaled-up residential systems.
Bankable documentation
Every commercial proposal ships with structural drawings, SLDs, warranty terms, and performance models suitable for CA review and bank financing.
Multi-site rollouts
If you have multiple sites, we plan and execute as a portfolio — standardized designs, centralized monitoring, single point of accountability.
Process
How we work with you
- 1
Load profile analysis
We review 12 months of electricity bills and site operations to design the right-sized system. Over-sizing wastes capital, under-sizing wastes roof.
- 2
Engineering and financial modeling
Complete system engineering plus CAPEX and OPEX financial models. IRR, payback, savings trajectories — all showable to your CA or CFO.
- 3
Permits, procurement, and approvals
DISCOM approvals, net-metering (or group captive setup), HT/LT coordination, component procurement from Tier-1 suppliers.
- 4
Installation with minimal disruption
Commercial installations typically 2-6 weeks depending on size. We plan sequencing to avoid disrupting your operations.
- 5
Performance monitoring and AMC
Real-time dashboard access, monthly performance reports, annual maintenance contracts. We report honestly — including underperforming months.
Calculator
Let's talk about your site.
Commercial solar only makes sense when the economics are honest. Our team will walk you through the real numbers for your specific operation.
Example output
- System size
- 150 kW DC
- Annual generation
- 220,000 kWh/yr
- Estimated first-year savings
- ₹13.2 Lakh first-year
- Simple payback
- 3.8 yr payback